Archive for the ‘New Projects’ Category

LeTourneau Student Center Grand Opening

Tuesday, March 18th, 2014

LeTourneau Student Centerr

DC is excited to be part of the new LeTourneau University Student Center, which opened this week in Longview, Texas. Students and faculty have been wowed by the facility which includes a game room, (with XBOX and PlayStation consoles), a multi-purpose meeting space, a prayer room, a commuter lounge, study rooms, and other spaces, including a new restaurant named The Hive where busy LeTourneau Yellowjackets can grab a bite between classes. The entire university is buzzing (sorry, I had to do it) about the new space and we’re thrilled to have been a part of it.

Check out this time lapse video of the LeTourneau Student Center being constructed!

ArtsLab Opens at the Auer Center

Monday, January 27th, 2014

artslab auer opening

DC recently joined Arts United Fort Wayne for the opening of the new ArtsLab theater inside the Auer Center. ArtsLab is designed to be more than just a performance space. It is meant to become an artistic incubator to inspire both current local artists and to grow our arts community. DC is proud to have been a part of this new addition to the Fort Wayne cultural scene.

A New Year and a New Space for LeTourneau University

Wednesday, January 8th, 2014

LETU Logo

LeTourneau University and DC are very excited about the opening of the new Anna Lee and Sidney Allen Family Student Center coming in March. Here’s a sneak peek at the new space, courtesy of LETU’s YouTube channel.

Hoernemann Stadium at Heidelberg University Moving Forward

Monday, December 9th, 2013

Field View - Final (Large)

DC is excited to announce that construction is moving forward on a major project at Heidelberg University to build the new Hoernemann Stadium and Fox Den Alumni Center. This facility will host various sporting events (including Heidelberg football which was ranked nationally in 2013!) and it will provide an important connection between the upper and lower areas of the Heidelberg campus. This is the third athletic project DC has completed at Heidelberg (the others being the Saurwein Wellness Center and their new turf field) and by improving student connectivity and providing engaging spaces to learn and train, we’re excited to see how DC was able to improve HU’s world so they can continue to achieve their academic and athletic goals.

LETU Student Center Nearly Complete!

Tuesday, November 26th, 2013

LETU SC 11-26-2013

After a little more than a year, the LeTourneau University Student Center is just about a month away from substantial completion. Transet Co. is doing a great job bringing the project together and working on finishing touches. The all-new LETU Student Center sits in the center of campus and adds a variety of new spaces for the LETU student body. The new Hive restaurant, campus bookstore, offices and gathering areas will provide even more community building opportunities among the students and faculty at LeTourneau.

LETU SC2 11-26-2013

Beam Raising at St. Peter’s Lutheran Church and School

Monday, November 18th, 2013
The final beam is placed at the site of the new St. Peter's Lutheran Church project

The final beam is placed at the site of the St. Peter’s Lutheran Church and School project

On November 10, DC joined St. Peter’s Lutheran Church and School and Weigand Construction to help them place the final steel beam at the top of St. Peter’s new addition, which is part of a larger construction and renovation project. Before placing the beam, representatives from St. Peter’s, Weigand, and DC, along with many St. Peter’s School students, signed the beam before sending it high above the crowd to the top of the addition’s frame.

Harrison Square Project Restarts

Tuesday, February 15th, 2011

Lead architect, and founding Design Collaborative Partner, Ron Dick spoke at a press conference in downtown Fort Wayne on Monday 2/14 announcing the construction of the $18m downtown Harrison Square project will begin this year. The 4-story building will house apartments, a law firm, a credit union, & O’Reilly’s Irish Bar. Construction will begin when weather permits and is scheduled for completion within 15 months.

Ron Dick at the Podium

Design Collaborative Makes a Field Trip

Thursday, October 14th, 2010

On Thursday, October 14th, the lunch hour was spent touring Hanning & Bean’s newest leased building… a corporate headquarters on the southwest side of Fort Wayne. The 80,000 sf building will be officially completed in the next few days so the DC associates were able to get a sneak preview. The DC design team, led by architects Kelly Shields, Tim Terman and Ron Dick, included Rich Busfield, Jamie Inskeep, Terry Wagner, Kevin Fenn and many others from Design Collaborative.

Design Begins on New Athletic Facility for Hillsdale College

Tuesday, March 23rd, 2010

Design Collaborative is in the early design stages of a new indoor track and tennis facility for Hillsdale College in Hillsdale, Michigan.  The facility will include a 200m track, tennis courts and support space for the NCAA DII Hillsdale College Chargers.

Hillsdale College Rendering